2026-05-12 01:04:17 -05:00
# Queue-North-Website — Development Log
2026-05-12 01:05:44 -05:00
## v0.1.1 — Phase 1 Agent-Pass Checkpoint — 2026-05-12
**Ripley** — Version correction and push rule alignment
- Corrected Phase 1 version from `0.1.0` to `0.1.1` after user clarified that each completed agent pass/checkpoint should be uploaded to `dev` and reflected as a patch increment.
- Updated package/version docs to make patch increments map to completed agent passes within the active phase.
- Re-ran build and backend health check before committing/pushing.
2026-05-12 01:04:17 -05:00
## v0.1.0 — Phase 1 Foundation — 2026-05-12
**Scarlett** — Design brief and UI polish
- Added the design implementation brief to `OVERHAUL_PLAN.md` .
- Established light-first business palette and layout rules.
- Completed focused UI/accessibility polish after Neo scaffold.
- Added Georgia numeric font token guidance and applied numeric styling to visible trust metric content.
- Improved Sheet/Header accessibility and standardized selected page containers/spacing.
- Confirmed old `styles.css` was used only as legacy context, not ported into the new design.
**Neo** — Phase 1 implementation
- Built Vite + React + Tailwind foundation.
- Added React Router route structure.
- Added Express backend and better-sqlite3 database integration.
- Added contact/support form API wiring.
- Set package version to `0.1.0` for Phase 1.
**Bishop** — Verification
- Verified `package.json` version matches Phase 1 (`0.1.0`).
- Verified frontend build with `npm run build` .
- Verified backend health endpoint responds OK.
- Verified required routes and API paths are configured.
- Confirmed `.gitignore` excludes `node_modules/` , `dist/` , and SQLite runtime database files.
- Approved Phase 1 for Ripley commit/push to `dev` .
**Ripley** — Coordination and final gate
- Verified repository remote and pushed README setup commit.
- Documented phase-based versioning in PROJECT.md, OVERHAUL_PLAN.md, and STRUCTURE.md.
- Documented the phase completion rule: after every verified phase, Ripley commits and pushes to `dev` .
- Running final build/health checks before committing Phase 1.
## v0.0.1 — 2026-05-11
**Ripley** — Project initialized
- Created project directory at `/home/kaspa/.openclaw/Projects/Queue-North-Website/` .
- Set up initial PROJECT.md, STRUCTURE.md, FUTURE.md, HISTORY.md, DEVELOPMENT_LOG.md.