Commit Graph

11 Commits

Author SHA1 Message Date
null c4985e37bc feat: Phase 5 SPA fixes, mobile menu, assets, and redesign planning
- Fix BrowserRouter → RouterProvider (routes were disconnected)
- Strip TS generics from .jsx files (Card, Badge, Dialog, Input, Textarea)
- Fix useToast import from sonner (Contact, Support)
- Merge mobile Sheet into Header (DialogTrigger outside Dialog)
- Add SPA catch-all route for client-side navigation
- Add CSP style-src for Google Fonts
- Copy all image assets to public/ (were 404)
- Replace placeholder logo with real Queue North logo
- Fix SheetContent positional CSS + install tailwindcss-animate
- Add visually hidden SheetTitle for accessibility
- Update README and FUTURE.md with Phase 5 redesign batches
- Add review.md (redesign assessment, exempt from git)
2026-05-13 22:07:35 -05:00
null c2d5873f08 feat: error handling hardening, 404 catch-all, health check DB test, request timeout, global error handlers (v0.4.8) 2026-05-13 19:59:19 -05:00
null 7257633d94 feat: rate limiting, helmet security headers, CORS, trust proxy, Docker env vars (v0.4.7) 2026-05-13 18:37:32 -05:00
null 6bfd804313 feat: Zoho CRM forwarding layer with OAuth2 token management (v0.4.6) 2026-05-13 18:28:56 -05:00
null 4ac0fa250d feat: server-side validation + input sanitization (v0.4.5) 2026-05-13 18:18:07 -05:00
null ee5af44b58 docs: update README phase 4 checkmark for validation 2026-05-13 18:10:16 -05:00
null 21b5418461 docs: update README phases with checkmarks for completed work 2026-05-13 18:03:03 -05:00
null 1f3e3864f9 feat: Docker batch 0.2.1 — production-ready containerization
- Multi-stage Dockerfile with non-root nodejs user
- Healthcheck using Node 20 built-in fetch (no wget)
- docker-entrypoint.sh: root permission fix, then exec to nodejs
- server/db.js: deferred SQLite init for Docker volume permissions
- docker-compose.yml with named volumes for persistence
- .dockerignore and .env.example added
- README updated with Docker usage section

Security reviewed by Private Hudson. All blockers resolved.
2026-05-12 01:57:55 -05:00
null c83dc08660 feat: complete phase 2 layout rebuild 2026-05-12 01:18:57 -05:00
null b7f7765a72 feat: complete phase 1 foundation 2026-05-12 01:04:17 -05:00
null c8307e61d6 docs: add Queue North website objective 2026-05-12 00:34:46 -05:00