Queue-North-Website/DEVELOPMENT_LOG.md

1.8 KiB

Queue-North-Website — Development Log

v0.1.0 — Phase 1 Foundation — 2026-05-12

Scarlett — Design brief and UI polish

  • Added the design implementation brief to OVERHAUL_PLAN.md.
  • Established light-first business palette and layout rules.
  • Completed focused UI/accessibility polish after Neo scaffold.
  • Added Georgia numeric font token guidance and applied numeric styling to visible trust metric content.
  • Improved Sheet/Header accessibility and standardized selected page containers/spacing.
  • Confirmed old styles.css was used only as legacy context, not ported into the new design.

Neo — Phase 1 implementation

  • Built Vite + React + Tailwind foundation.
  • Added React Router route structure.
  • Added Express backend and better-sqlite3 database integration.
  • Added contact/support form API wiring.
  • Set package version to 0.1.0 for Phase 1.

Bishop — Verification

  • Verified package.json version matches Phase 1 (0.1.0).
  • Verified frontend build with npm run build.
  • Verified backend health endpoint responds OK.
  • Verified required routes and API paths are configured.
  • Confirmed .gitignore excludes node_modules/, dist/, and SQLite runtime database files.
  • Approved Phase 1 for Ripley commit/push to dev.

Ripley — Coordination and final gate

  • Verified repository remote and pushed README setup commit.
  • Documented phase-based versioning in PROJECT.md, OVERHAUL_PLAN.md, and STRUCTURE.md.
  • Documented the phase completion rule: after every verified phase, Ripley commits and pushes to dev.
  • Running final build/health checks before committing Phase 1.

v0.0.1 — 2026-05-11

Ripley — Project initialized

  • Created project directory at /home/kaspa/.openclaw/Projects/Queue-North-Website/.
  • Set up initial PROJECT.md, STRUCTURE.md, FUTURE.md, HISTORY.md, DEVELOPMENT_LOG.md.