1.8 KiB
1.8 KiB
Queue-North-Website — Development Log
v0.1.0 — Phase 1 Foundation — 2026-05-12
Scarlett — Design brief and UI polish
- Added the design implementation brief to
OVERHAUL_PLAN.md. - Established light-first business palette and layout rules.
- Completed focused UI/accessibility polish after Neo scaffold.
- Added Georgia numeric font token guidance and applied numeric styling to visible trust metric content.
- Improved Sheet/Header accessibility and standardized selected page containers/spacing.
- Confirmed old
styles.csswas used only as legacy context, not ported into the new design.
Neo — Phase 1 implementation
- Built Vite + React + Tailwind foundation.
- Added React Router route structure.
- Added Express backend and better-sqlite3 database integration.
- Added contact/support form API wiring.
- Set package version to
0.1.0for Phase 1.
Bishop — Verification
- Verified
package.jsonversion matches Phase 1 (0.1.0). - Verified frontend build with
npm run build. - Verified backend health endpoint responds OK.
- Verified required routes and API paths are configured.
- Confirmed
.gitignoreexcludesnode_modules/,dist/, and SQLite runtime database files. - Approved Phase 1 for Ripley commit/push to
dev.
Ripley — Coordination and final gate
- Verified repository remote and pushed README setup commit.
- Documented phase-based versioning in PROJECT.md, OVERHAUL_PLAN.md, and STRUCTURE.md.
- Documented the phase completion rule: after every verified phase, Ripley commits and pushes to
dev. - Running final build/health checks before committing Phase 1.
v0.0.1 — 2026-05-11
Ripley — Project initialized
- Created project directory at
/home/kaspa/.openclaw/Projects/Queue-North-Website/. - Set up initial PROJECT.md, STRUCTURE.md, FUTURE.md, HISTORY.md, DEVELOPMENT_LOG.md.